Add/Remove/Change integration link while/after tracking

  • 57Views
  • Last Post 17 February 2017
0
votes
Drafigon posted this 16 February 2017

I would link to add an integration link (a Trello card) to a task, if I forgot to start the tracking from the external tool.

Order By: Standard | Newest | Votes
0
votes
Aleksandr Serdyuk posted this 16 February 2017

It's not as simple as it sounds. Actually, it's a massive feature.

But here is a quick workaround:

  • Return to Trello
  • Click Start Timer on the card
  • Switch back to TMetric
  • Open the time entry you want to link to the card for editing.
  • Select the first item from the drop-down list at the task description control
  • Click Save

0
votes
Drafigon posted this 16 February 2017

I thougth about this workaround and will try it next time. Thx

 

Maybe a input field for a link, which one can set manually, would be enough?

0
votes
Aleksandr Serdyuk posted this 17 February 2017

It won't be enough in the common case.

Close